Sample new home report

Sample new home inspection report.

Pages from a real practical completion (handover) inspection of a new townhouse in Melbourne. 26 items were recorded for the builder to fix before handover.

Summary first

Summary of a sample practical completion report: 14 defective work, 5 incomplete work, 4 damage, 0 safety hazard and 3 further investigation, with repairs grouped by trade: painter, fencer, builder, plumber, cabinet maker, glazier and carpenter
Every item counted by type, and grouped by tradeThe first page: how many items are defective work, incomplete work, damage, safety hazards or need further investigation, then every item listed under the trade that would fix it, so the builder can hand them straight to the painter, plumber or carpenter.

More from the report

Client brief and scope page of a sample new home inspection report
What we checked, and against whatThe brief, the standards the work is checked against, and how repeated items are reported.
Blurred ground floor plan with numbered defect marks from a sample new home report
Every item on the floor planEach number is marked on the plan, so you and the builder can find it on site.

Some of the items found

Sample defect page: caulking missing at skirtings and architraves, with three photos and Guide to Standards and Tolerances references
Gaps not caulkedGaps at skirtings, architraves and joinery, with the Guide to Standards and Tolerances clause and tolerance.
Sample defect page: missing paint or stain to the deck, and sliding door track drainage obstructed by the deck
Deck not finished, door track drainage blockedNo paint or stain on the new deck, and the deck covering the sliding door track drainage.
Sample defect page: screws not fit for purpose at window hardware, and an area not cleaned
Screws too longWindow hardware fixed with screws too long for the job, seen throughout the home; areas left uncleaned.
Sample defect page: shower head leaking from the joint, with a photo of water escaping
Shower head leakingWater leaking from the shower hose joint when the shower was run.
Sample defect page: debris left on the roof and an exposed pipe on the roof
Rubbish left on the roof, exposed pipeBuilder’s debris left in the roof box gutter, and an exposed pipe on the roof to be checked.

Missed the PCI? What you'd pay yourself

A well-built Brighton townhouse, and still 26 items. Free if the builder fixes them before handover.

TradeItems · if left unfixedCost
Roofer#24, #25Water into ceilings$400 – $800
Carpenter#4Water onto floors$300 – $650
Plumber#7, #10, #23Leaks$320 – $580
Painter#3 deckDeck splits and greys$950 – $1,750
Painter8 paint and scuff itemsTreated as owner damage$650 – $1,400
Handyman9 fittings, caulking, screwsRust, cracks, wear$600 – $1,200
Cleaner#15, #21Treated as owner's$220 – $400
Total$3,440 – $6,780

The full report also lists every area inspected with photos, and the terms. Every build is different: your report records what is found at your inspection.

Get a quote for your new home About practical completion inspections